The installation of a screen for IFLYTEK in an environment like Llotja de Mar is not just a technical deployment. It is an exercise in precision, adaptation and coordination in a space where every decision counts.

Within the framework of Mobile World Congress 2026, this private event brought together strategic clients in a historic setting, with a clear objective: to present machine translation solutions in a unique, professional format with no margin for error.

But behind a flawless presentation, there is a much more complex process than it seems.

Installation of a screen for IFLYTEK in a historic building: the challenge of intervening without disturbing

One of the main challenges of the display installation for IFLYTEK was the space itself.

Llotja de Mar is not a conventional location. It is a historic building with strict restrictions: no drilling, fixing structures or altering surfaces is allowed.

This forces us to completely rethink the way we install technology.

Each element had to be self-supporting, stable, without anchors, safe for the environment and visually integrated

Here, the installation ceases to be standard. It becomes a work of total adaptation to the space.

Pre-planning in the display installation for IFLYTEK

The success of the Display Installation for IFLYTEK began long before the day of the event.

For two months, we worked in coordination with the client to define needs, understand the space and anticipate possible limitations.

A month earlier, a key technical visit was carried out:

  • Analysis of the environment
  • Defining Installation Points
  • Coordination with lighting and sound equipment

This type of project is not improvised. It is designed.

In addition, an additional element was incorporated: multilingual management. Customer communication – in English and Chinese – required ongoing support to ensure that every decision was accurately understood.

Display installation for IFLYTEK: real-time execution with no margin for error

On the day of the event, the Display Installation for IFLYTEK entered its most critical phase.

At 06:00, the unloading of equipment began. At 11:00, the technical team began the installation. At 14:00, everything had to be ready.

Three hours to set up a complete system in a technically constrained environment and multiple teams working in parallel.

From there, final rehearsals were held until 4:30 p.m., ensuring that everything worked in sync before the start of the event.

At 5:00 p.m., the presentation began.

And at that moment, everything had to work as if it had always been there.

Technical coordination in the installation of a screen for IFLYTEK

One of the most complex aspects of the IFLYTEK Display Installation was the coordination between teams.

In an event of this type, not only one supplier is involved. We work with audiovisual equipment, lighting technicians, sound systems and event coordination

Each one with their own times, needs and priorities.

The key was synchronization. Not only technical, but also operational.

During the event, support did not stop. Continuous assistance was maintained, including translation tasks and real-time coordination, ensuring that any adjustments were resolved without affecting the experience.

Display installation for IFLYTEK: technology at the service of the message

The objective of the event was not only technical. It was communicative.

The Display Installation for IFLYTEK had to allow machine translation solutions to be clearly displayed, in an environment where every detail influences the customer’s perception.

The screen was not the protagonist. It was the medium.

A medium that had to guarantee perfect visibility, integrate with the space and not interfere with the experience

When this is achieved, the technology disappears… and the message is amplified.

Display installation results for IFLYTEK

The final result of the Display Installation for IFLYTEK was highly satisfactory.

The event took place without incidents, meeting the times, respecting the space and maintaining a high technical level at all times.

But beyond execution, what was most relevant was the customer’s perception: efficient organization, smooth coordination, and precise execution

In this type of project, success is not measured only in what is seen, but in everything that does not fail.

Display installation for IFLYTEK: when planning makes all the difference

This project proves that a display installation for IFLYTEK is not just a technical task.

It is a process where space conditions the solution, time defines the execution and coordination guarantees the result

And where every detail, no matter how small it may seem, directly impacts the final experience.

EUNO: solutions that adapt to each environment

At EUNO we work with the understanding that each installation is different.

The Display Installation for IFLYTEK is an example of how technology should adapt to the context, not the other way around.

From planning to execution, the goal is clear: to deliver solutions that work, integrate, and deliver real value.

If you are developing an event or project where the technology must fit perfectly, we can help you.

Share this post:

Related Posts

LED Screens
September 3, 2026

Installation of LED screens

September 3, 2026

Best Stand Award: EUNO wins Gold at ISE 2026